Renovatie Rozenburgsesluis - Procon Planning

Renovatie Rozenburgsesluis

Infrastructure

🇳🇱 Port of Rotterdam, Netherlands
Current Project Status
Definitive Design (DO) Phase | Construction Commencing October 2026
Following the preparation, onboarding and VO design phases, the project is currently in the Definitive Design (DO) phase. The Execution Design (UO) phase will follow before construction works begin in October 2026. The contractually fixed lock closure window makes schedule precision and control the defining challenge of this project.
Aerial view of the Rozenburgsesluis, Port of Rotterdam

Planning Precision at Europe's Critical Maritime Corridor

The Renovatie Rozenburgsesluis is a highly complex infrastructure project situated within one of Europe's most critical maritime corridors. The project commenced in June 2025 with the preparation and onboarding phase, followed by the design phase at VO. The project is currently in the Definitive Design (DO) phase, with the Execution Design (UO) phase to follow and construction works scheduled to start in October 2026.

The Defining Challenge Fixed Closure Window

The temporary closure of the lock is only permitted for a strictly agreed and contractually fixed period. Any overrun would have significant consequences for marine traffic and logistics across the wider Port of Rotterdam area, where the lock plays a vital role in the transport of goods. As a result, planning precision and control are absolutely critical.

Project in Context

Read more on Port of Rotterdam's project page

Project Details

Procon Client
Vialis
End Client
Port of Rotterdam
Industry / Sector
Infrastructure
Timeline
June 2025 – July 2027
Location
Port of Rotterdam, Netherlands

Procon's Role

End-to-End Planning & Schedule Certainty

Procon Planning supports the project through end-to-end planning and project controls, acting as a key partner in safeguarding schedule certainty. By combining structured planning, hands-on execution support and advanced risk forecasting, Procon helps create the conditions for a controlled lock closure and the on-time delivery of this critical maritime asset.

  • Developing the contractually accepted integrated baseline schedule
  • Ongoing maintenance, updating and progress monitoring of the programme
  • Facilitating detailed lean execution planning, enabling the site teams to work with clear, realistic and optimised work sequences
  • Supporting risk management through iterative schedule risk analysis and probabilistic planning, ensuring the most realistic completion forecasts, even when identified risks materialise
Procon Planning consultant