Windpark Oranjepolder - Procon Planning

Windpark Oranjepolder

Onshore Wind Energy

🇳🇱 Oosterhout, Brabant, Netherlands
Current Project Status
Fast-Track Development | Planning & Procurement Phase
Windpark Oranjepolder is in active development, with physical construction commencing in November 2026 and commercial operation targeted for March 2027. With a compressed delivery window across three parallel EPC packages, tight schedule integration and proactive interface management are central to Procon's engagement from day one.
Windpark Oranjepolder project site, Oosterhout, Brabant

Integrated Planning for a Compact, Fast-Track Onshore Wind Project

Windpark Oranjepolder is an onshore wind project located in the Oosterhout area of Brabant, near the A59, consisting of two Nordex wind turbines. The project commenced in January 2026, with physical construction starting in November 2026 and commercial operation scheduled for March 2027 — making it a highly time-critical, fast-track development.

Procon Planning supports Eneco in their role as end client and developer, providing structured planning and project controls across the full project lifecycle.

Fast-Track Programme Jan 2026 – Mar 2027

From project start to commercial operation in under 15 months — with physical construction, turbine installation and grid connection all compressed into a four-month window. Every interface matters.

Managing Interfaces in a Multi-EPC Environment

Although compact in scale, the project is delivered through three parallel EPC packages:

  • Civil and foundation works
  • Electrical scope, including park cabling and grid connection
  • Turbine supply, installation and commissioning

Each package is executed under a separate EPC contract, creating multiple technical and schedule interfaces that must be tightly managed to safeguard the ambitious programme.

Project Details

Client
Eneco
Industry / Sector
Renewable Energy (Onshore Wind)
Timeline
January 2026 – March 2027
Location
Oosterhout, Brabant, Netherlands
Turbines
2 × Nordex

Procon's Role

Disciplined Integration, Delivered on Time

Through disciplined integration of subcontractor schedules and proactive interface control, Procon helps Eneco maintain momentum and deliver this fast-track wind project on time and with confidence.

  • Preparing and maintaining the integrated project baseline schedule
  • Continuous progress monitoring and schedule updates
  • Actively managing interfaces between EPC packages
  • Early identification of risks and conflicts, enabling timely mitigation
Procon Planning consultant